armor.wikisort.org - Tank

Search / Calendar

Altay is a Turkish modern main battle tank that was designed by Otokar with the help of Republic of Korea’s Hyundai Rotem.The serial production bid was taken by BMC in 2018 and serial production is expected to start in 2023.[9][10]It is named in honor of Army General Fahrettin Altay[28] who commanded the 5th Cavalry Corps in the final stage of the Turkish War of Independence. It is one of the most expensive tank designs with a unit cost of 13.75 million dollars.[29] The first mass production of Altay will be combined with MKE made 55 calibre 120 mm main gun, Roketsan made advanced armor package along with Aselsan made active protection system, and Hyundai Doosan Infracore engine and SNT Dynamics transmission.[25][26]

Altay
Altay T1 demonstrator unveiled by the company BMC at the IDEF 2019 in Istanbul, Turkey[1]
TypeMain battle tank
Place of originTurkey
Service history
In service2023 (expected)[2]
Used byTurkish Land Forces[3]
Production history
DesignerOtokar (design and development including prototypes)[4][5]
BMC (main contractor and responsible for further developments)[6]
ASELSAN (sub-systems and fire control system)[6][7]
MKEK (main gun system)[3][6]
ROKETSAN (armor package)[3][6][8]
HAVELSAN[6]
Hyundai Rotem (Design assistance and transfer of Technology)[9][10][11][12][13]
Hyundai WIA (Transfer of 120 mm 55 caliber smoothbore gun production technology)[9][10]
[11][12]
Samyang Comtech, Poongsan (Transfer of armor package technology and performance test)[11][14]
Designed2008–2016
ManufacturerBMC[6][15]
Unit costUSD $13.75 million[16]
ProducedNovember 2018
No. built10 units. A total of 1,000 main battle tanks are planned to be produced in four separate lots of 250 units[17]
Specifications
Mass65 tonnes (72 short tons; 64 long tons)[18]
Length7.3 metres (24 ft) (hull), 10.3 metres (34 ft) (gun forward)[19]
Width3.9 metres (13 ft)[19]
Height2.6 metres (8.5 ft)[19]
Crew4 (commander, gunner, loader, driver)[18]

Armor
  • Tank armor: ROKETSAN armor package including composite armor modified based on Korean Special Armor Plate (KSAP)[20]
  • Active protection system: Aselsan AKKOR equipped with both hard kill and soft kill functionalities along with electronic warfare (EW) computer
    (In development)[21][22][23]
Main
armament
MKE 120 mm smoothbore tank gun[24]
Secondary
armament
1 × Remote controlled weapon station equipped with 12.7 mm / 7.62 mm machine gun[1]
1 x 7.62 mm coaxial machine gun[1]
EngineLot 1: Hyundai Doosan Infracore DV27K 4-long stroke, 12-cylinder water-cooled diesel, dry weight: 2550 kg
1,500 hp (1,110 kW)[25][26]
Lot 2: BMC Power BATU V12 4-short stroke, 12-cylinder water-cooled diesel
1,500 hp (1,100 kW)[25][26]
Power/weight27.2 hp/tonne
TransmissionLot 1: SNT Dynamics EST15K (6 forward, 3 reverse gears), dry weight: 2500 kg[25][26]
Lot 2: BMC Power BATU V12 Cross Drive (6 forward, 2 reverse gears)[25][26]
SuspensionHydropneumatic Suspension Unit (HSU)[27]
Operational
range
450 kilometres (280 mi)(Altay T1 with 1,500 hp engine)[27]
Maximum speed 65 km/h (40 mph) max (Altay T1 with 1,500 hp engine)[27]

History and development


The National Tank Production Project (Turkish: MİTÜP – Milli Tank Üretimi Projesi) was an initiative developed in the mid-1990s to establish independent and robust infrastructure for the production, development and maintenance of main battle tanks used by the Turkish Armed Forces.[30][31] In order to improve the current technical capabilities of the Turkish defense industries and increase the amount of domestic contribution towards national defense, the Undersecreteriat for Defense Industries decided that a "National Tank" will serve as a catalyst for uniting certain Turkish defense companies around a common goal and for providing the Turkish military with extra firepower in the form of a modern tank.

The tank design benefited from design assistance and transfer of technology by Hyundai Rotem.[9][10][11][12][13] The project was initiated with an agreement signed between Otokar and the Undersecretariat for Defense Industries of the Republic of Turkey on 30 March 2007, when the Defense Industries Executive Committee awarded a contract worth approximately $500 million to Otokar for the design, development and production of four prototypes of a national main battle tank. On July 29, 2008, Turkey and Hyundai Rotem signed a ₩500 billion (approximately US$540 million) design assistance and technology transfer contract for tank development. This contract consists of design assistance and technology transfer related to the development of systems, armor packages, and 120 mm guns necessary for the development of Altay tanks, and includes design assistance and technology transfer of Hyundai Rotem, Hyundai WIA, and Agency for Defense Development throughout the development process.[9][10][11][12][13] The Turkish Ministry of Defense allocated a budget of $1 billion for the development of the Altay.[32] This is Turkey's first MBT development program since 1943, when prototypes of a Turkish national tank were produced in Kırıkkale,[33][better source needed] but 1943's program never reached full-scale mass production.

The first 3D image of the MBT was released to the public on 7 April 2010 during a press release by the Undersecreteriat for Defense Industries of the Republic of Turkey.[34]

In 2012, Otokar General Manager Serdar Görgüç has announced that the company is considering the development of an electric engine for the Altay.[35] However, the electric engine probably no longer in consideration.

The military electronics company ASELSAN manufactures and integrates the Volkan III modular fire control system, command, control and information systems, while state-owned MKEK (Mechanical and Chemical Industries Corporation) produce MKE 120 mm tank gun. Another state company ROKETSAN produce an indigenous armor.

The first prototype Altay was ready for use by the end of 2016.[36] Once the prototypes are produced and tested, the Undersecreteriat for Defense Industries of the Republic of Turkey will prepare and execute a separate order for the first lot of 250 tanks. A total of 1000 MBTs are planned to be produced in four separate lots of 250 units. Every delivered lot is expected to have additional upgrades.[37]

Otokar completed all infrastructure planning and programming for mass production. Koç Holding Vice Chair and Otokar Chair Ali Koç said mass production was expected to start 18–22 months after their offer was accepted.[38]

However, on 9 November 2018, Turkish Presidency of Defense Industries signed agreement with BMC for mass production of the tank.[6] In the process, BMC replaced Otokar as the main contractor and responsible for further developments.[1]

The production of Altay has been delayed since 2018, as the programme was relying on German 1,500 hp MTU engines and RENK transmissions,[39] because of the German federal arms embargo on Turkey due to their involvement in the Syrian Civil War.[40]

However, BMC Power, a subsidiary of BMC, replaced MTU as engine subcontractor for 1,500 hp engine. BMC Power is the designer and manufacturer of the serial production BATU V12 1,500 hp engine.[41][42][1][43]

On 10 March 2021, BMC announced that it plans to import a Korean power pack that combines Doosan Infracore (now Hyundai Doosan Infracore) DV27K engine and SNT Dynamics EST15K transmission and complete the performance test of the Altay tank according to Turkey's own standards as soon as possible.[44]

On 11 August 2021, the South Korean Defense Acquisition Program Administration announced that it was looking for a Korean company to develop an improved SNT Dynamics EST15K transmission for use in Altay and K2 Black Panther.[45]

On 7 October 2021, the South Korean Defense Acquisition Program Administration announced that it is looking for a Korean company to develop a indigenous Transmission control unit to replace the German Transmission control unit used in the SNT Dynamics EST15K transmission to export transmissions to Turkey.[46]

On 22 October 2021, Kang Eun-ho, head of South Korea's Defense Acquisition Program Administration, said he had approved the export of Hyundai Doosan Infracore DV27K engines and SNT Dynamics EST15K transmissions to Turkey during a meeting with Turkish Foreign Minister Mevlüt Çavuşoğlu visiting South Korea.[47]

At the Antalya Diplomacy Forum held on March 11, 2022, Professor Ismail Demir, president of Turkish Defense Industries (SSB), revealed that he was testing Hyundai Doosan Infracore DV27K engine and SNT Dynamics EST15K transmission imported from South Korea and he said in May that he will be able to see a prototype of Altay, which combines Korean engines and transmissions.[48]

On August 2022, the durability test of the powerpack combined with the DV27K engine and EST15K transmission imported from South Korea is underway, and if the durability test succeeds, the first 250 Altay will be produced by integrating the Korean powerpack.[49]


Contractors and subcontractors


Subsequently, in accordance with the later Defense Industries Executive Committee ruling, subcontractors were selected as follows:


Prototypes


On 29 April 2009, the Subsecretary for Defence Industries of Turkey, Murad Bayar has confirmed at the 9th IDEX International, Defense Industry Fair in Abu Dhabi, that the Turkish tank will be manufactured using only Turkish resources. He added that the research started last week and that he expected to create an authentic tank model specially designed for the needs of the Turkish Armed Forces within 3 years.[50]

As of September 2010, with approval of the tank subsystems and software by Undersecretariat for Defense Industries, Conceptual Design Phase of the Altay project has been completed. Thus, the project advanced to Detailed Design Phase scheduled to last 30.5 months. The scope of the Detailed Design Phase is to design and integrate interfaces for the selected tank subsystems.[citation needed]

On 15 October 2010, Otokar signed a contract with MTU and Renk for the supply of power pack.[citation needed]

On 15 December 2010, Defence Industry Executive Committee decided to start the development of national power pack.[51]

On 10 May 2011, Aselsan was contracted by the Undersecretariat for Defense Industries to design and develop two Battlefield Target Identification Device (BTID) prototypes.[52]

On 11 May 2011, the mock-up of the Altay was introduced to the public in IDEF2011.[53][54]

On 18 October 2012, the first Altay was put on trials although lacking side skirts and using a mock-up turret to simulate a real turret.[55]

On 16 November 2012, two Altay prototypes successfully passed initial acceptance tests, paving the way for serial production 2 years earlier than expected, with two more prototypes to be built by 2013 or 2014.[56][57]

On 7 November 2016, all Otokar made prototypes had been delivered to the Turkish Land Forces, and their acceptance tests were expected to finish in the last quarter of 2016 or early 2017.[58]

In May 2019, BMC made latest prototype (demonstrator) of the Altay T1 was unveiled by the company during the IDEF defense exhibition.[1]


Design


Altay T1 tank info
Altay T1 tank info

The tank will benefit both from indigenously developed systems and from technologies of the K2 Black Panther, accorded by an agreement signed with South Korea.[9][10][11][12][13] The main armament of the tank is the 120 mm 55 caliber smoothbore gun, which was redesigned under license based on the CN08 120 mm gun of the K2 Black Panther. the thermal sleeve of the gun barrel is equipped with a gun stabilizer configured with a static muzzle reference system (SMRS).

The armor package was modified based on the K1A1 and K2's Korean Special Armor Plate (KSAP),[20] but was redesigned for higher ballistic protection in the Altay and will include CBRN defense elements, to protect it from chemical, biological, radiological and nuclear weapons.

The planned maximum speed of the first batch is set at 65 kilometres per hour (40 mph), provided by an 1,500 hp (1,100 kW) engine and the MBTs will be able to function under 4 metres (13 ft) of water.[27] The first mass production tank will be powered by 1,500 hp (1,110 kW) DV27K engines and EST15K transmissions (6 forward, 3 reverse gears) designed by Hyundai Doosan Infracore and SNT Dynamics in South Korea.[25][26] whereas the latter batches may powered by an BMC Power BATU V12 12 cylinder V type 1,500 hp (1,100 kW) engine.[25][26]

While moving at high speeds, to evade ATGM attacks, sudden braking and manoeuvering at severe angles are capabilities that were taken into consideration from early developmental stages. An isolated ammunition compartment (turret bustle) is designed to protect tank crew, alongside fire and explosion suppression systems which are to activate when hit or when the tank is involved in an accident. The tank is to be equipped with sensors for the detection of contaminated air from chemical, biological and nuclear weapons.[5] The tank also has hunter-killer engagement capability.[39]


Variants



Foreign interest


According to reports, a military envoy from Colombia was present at the 2010 press meeting hosted by the Undersecreteriat for Defense Industries of the Republic of Turkey to obtain more information about the tank.[34]

In April 2013, officials of the Saudi Arabian Army reportedly became interested in the Altay main battle tank,[61] and at IDEF-2013, the Azerbaijan Army expressed interest in the Altay tank.[62]

Additionally, Otokar placed a bid for 77 Altays for a tender in Oman in August 2013.[63] In January 2016, Turkey reported that the Altay had received interest from Pakistan and Gulf Arab countries.[64]

Pakistan and Saudi Arabia have shown interest in procuring the Altay for their armed forces.[65]

In March 2019, a senior Turkish politician stated an order for 100 tanks was placed by Qatar and that the first 40 of these would be delivered in the coming two years.[66][67]


Sales


The Altay won the Turkish army contract, estimated at $3.5B and signed on 9 November 2018 for a batch of 250 tanks. Three more similar batches are expected.[68][69]

Qatar has purchased 100 Altay tanks along with an estimated 20 T-155 Firtina SPH.[70]


Operators



Future Operators


 Turkey
 Qatar

See also



References


  1. "Turkey to conduct field tests with its local-made Altay tank fitted with Turkish powerpack". Army Recognition. 3 April 2021. Retrieved 11 August 2021.
  2. "ALTAY Tank Will Be Delivered to TAF at the Beginning of 2023". RayHaber. Retrieved 10 August 2021.
  3. "Altay MBT". Military Factory. Archived from the original on 8 April 2014. Retrieved 8 April 2014.
  4. "Otokar launches Turkey's first Altay tank prototypes". Army Technology. 22 November 2012. Retrieved 10 August 2021.
  5. "Altay Tank" (PDF). Roketsan.com.tr. Archived (PDF) from the original on 28 February 2013. Retrieved 28 February 2015.
  6. "ALTAY". TURKISH DEFENCE INDUSTRY PRODUCT CATALOGUE. Retrieved 10 August 2021.
  7. "Altay Tankı Özellikleri". 9og. Archived from the original on 8 April 2014. Retrieved 8 April 2014.
  8. "Turkey's Altay Tank: Will It Really Be Ready for War This Year?". The National Interest. 10 June 2021. Retrieved 10 August 2021.
  9. Hyundai Rotem (31 July 2008). "터키 전차개발 기술협력 계약 체결". Hyundai Rotem. Archived from the original on 10 October 2021. Retrieved 10 October 2021.
  10. Kim Gwigeun (11 October 2009). "'흑표' 기술수출료 2014년까지 사용유예". Yonhap News. Archived from the original on 10 October 2021. Retrieved 10 October 2021.
  11. Choi Seunguk (20 October 2014). "[방산업계 울리는 ADD] 터키 수출 K-2전차 기술료 다 챙겨…'700억 돈잔치' 벌이겠다는 ADD". Korea Economic Daily. Archived from the original on 10 October 2021. Retrieved 10 October 2021.
  12. Army Recognition (1 October 2021). "Altay MBT Main Battle Tank". Army Recognition. Archived from the original on 4 December 2021. Retrieved 24 October 2021.
  13. "Defense Export". Agency for Defense Development. Archived from the original on 30 May 2022. Retrieved 30 May 2022.
  14. "History". Samyang Comtech. 2021. Archived from the original on 3 May 2022. Retrieved 3 May 2022.
  15. "Contract signed for mass production of Turkish battle tank – Latest News". Hürriyet Daily News. Archived from the original on 14 November 2018. Retrieved 13 November 2018.
  16. "Altay tankı projesi için teklifler haftaya". 11 January 2016. Archived from the original on 17 May 2016. Retrieved 20 April 2016.
  17. "Armor: Turkish Leopards Find Redemption". www.strategypage.com.
  18. "Altay Main Battle Tank". Army Technology. 15 June 2011. Archived from the original on 19 September 2012. Retrieved 28 February 2015.
  19. "Army Guide – Altay". Army Guide. Retrieved 8 April 2014. [permanent dead link]
  20. "Special Armor Plate for K1A1 Tank, K2 Tank, Altay Tank". Samyang Comtech. Archived from the original on 2 September 2022. Retrieved 2 September 2022.
  21. "AKKOR" (PDF). Aselsan. Archived from the original (PDF) on 29 April 2021. Retrieved 10 August 2021.
  22. Melike Günaydın (5 June 2021). "Duplicate production and deliveries of the PULAT Active Protection System continue". Defence Turk. Archived from the original on 17 March 2022. Retrieved 17 March 2022.
  23. Luca Peruzzi (4 March 2022). "Active Protection Systems and Suite Controllers for Combat Vehicles". European Security & Defence. Archived from the original on 17 March 2022. Retrieved 17 March 2022.
  24. "ALTAY WEAPON SYSTEM". TURKISH DEFENCE INDUSTRY PRODUCT CATALOGUE. Retrieved 10 August 2021.
  25. "Engine to power Turkey's long-awaited MBT Altay arrives from S. Korea". Daily Sabah. 14 March 2022. Archived from the original on 16 March 2022. Retrieved 16 March 2022.
  26. "South Korean Doosan Infracore delivers DV27K engine to power Turkish Altay MBT". Army Recognition. 15 March 2022. Archived from the original on 16 March 2022. Retrieved 16 March 2022.
  27. "TankAltayT1". Wikimedia Commons (official info by BMC). 2 May 2019. Retrieved 11 August 2021.
  28. "Milli tank 'altay' için yola çıkıldı – Ekonomi Haberleri". Radikal. 30 July 2008. Retrieved 28 February 2015.
  29. "Altay tankı projesi için teklifler haftaya". 11 January 2016.
  30. Archived 8 April 2014 at the Wayback Machine
  31. "ALTAY PROJECT; Undersecretariat for defence Industries". Archived from the original on 22 July 2011. Retrieved 7 October 2010.
  32. "Milli helikopterimiz parmak ısırtıyor". En son haber. 28 January 2013. Archived from the original on 31 January 2013. Retrieved 28 February 2015.
  33. "Savunma Sanayii Forum • Konuyu görüntüle – İlk Milli tank projesi MKE Kırıkkale 1943". TRMilitary. 27 August 2010. Archived from the original on 8 April 2014. Retrieved 28 February 2015.
  34. "Otokar unveils the Altay MBT". TR Defence. 7 April 2010. Archived from the original on 13 April 2010. Retrieved 28 February 2015.
  35. "Otokar mulls making of domestic 'electric tank'". Hurriyetdailynews.com. Archived from the original on 19 September 2015. Retrieved 28 February 2015.
  36. "Milli Tank Altay'ın üretim serüveni". Archived from the original on 20 September 2015. Retrieved 16 August 2015.
  37. "ANKARA – Turkish main battle tank project aims to meet needs of Turkish Armed Forces (TSK)". Archived from the original on 22 September 2007. Retrieved 21 November 2016.
  38. "Koç awaits gov't approval to start mass production of domestic Turkish battle tank Altay". hurriyetdaillynews.com. 10 November 2016. Archived from the original on 21 November 2016. Retrieved 21 November 2016.
  39. "Altay Main Battle Tank | Military-Today.com". www.military-today.com.
  40. "Turkey in talks with South Korea to salvage Altay tank program". Defense News. 19 November 2020.
  41. "BMC Power".
  42. "V12 Project". BMC Power. Retrieved 11 August 2021.
  43. "Turkey Reports Successful Test of 'Homegrown' Tank Engine". 7 May 2021.
  44. Kim Min-seok (10 March 2021). "터키 차세대 전차 '알타이'에 '국산파워팩' 수출". News1 Korea. Archived from the original on 16 March 2021. Retrieved 16 March 2021.
  45. Defense Acquisition Program Administration (11 August 2021). "2021년 2차 무기체계 개조개발 지원사업 지원과제 및 주관기업 모집 공고". Defense Agency for Technology and Quality. Archived from the original on 25 October 2021. Retrieved 25 October 2021.
  46. Defense Acquisition Program Administration (7 October 2021). "「K2 전차 변속제어기 (TCU) 변속제어 소프트웨어 부품성능개량개발」 일반부품 국산화사업 주관기업 모집공고". Defense Agency for Technology and Quality. Archived from the original on 25 October 2021. Retrieved 25 October 2021.
  47. Kim Seung-uk (22 October 2021). "터키 전차에 국산 파워팩 탑재…터키 외무 "수출 승인받아"". Yonhap News Agency. Archived from the original on 25 October 2021. Retrieved 25 October 2021.
  48. Kamer KURUNÇ (16 March 2022). "South Korean Engine to Power Turkey's ALTAY Tank". Turkish Defence News. Archived from the original on 15 March 2022. Retrieved 15 March 2022.
  49. Yusuf Emir Işık (11 August 2022). "ALTAY tankı 2025'de milli güç grubuna sahip olacak". Defenceturk. Archived from the original on 1 September 2022. Retrieved 1 September 2022.
  50. "ATAK helicopter to be airborne before end of 2009". Today's Zaman. Archived from the original on 6 May 2009. Retrieved 17 April 2010.
  51. "HATA – SSB". www.ssb.gov.tr. Archived from the original on 18 December 2010.
  52. "Battlefield Identification Device". Archived from the original on 31 March 2012. Retrieved 21 November 2016.
  53. "Turkey introduces main battle tank Altay | Politics | Worldbulletin News". Worldbulletin.net. 15 November 2012. Archived from the original on 1 July 2015. Retrieved 28 February 2015.
  54. "ALTAY TANK MOCK-UP – IDEF 2011 ISTANBUL". 13 May 2011. Archived from the original on 12 February 2017. Retrieved 28 February 2015 via YouTube.
  55. "Tank photograph". Fbcdn-sphotos-e-a.akamaihd.net. Archived from the original (JPG) on 14 January 2015. Retrieved 28 February 2015.
  56. "Turkey to reveal local tank ahead of deadline – ECONOMICS". Hurriyetdailynews.com. Archived from the original on 17 November 2012. Retrieved 28 February 2015.
  57. "Altay tank project moves Turkey up a league in defense". En.trend.az. 16 November 2012. Archived from the original on 19 November 2012. Retrieved 28 February 2015.
  58. "Karaaslan: üç prototipin testleri 2017'de tamamlanırsa Altay Tankı 2018'de üretilir". c4defence.com. 7 November 2016. Archived from the original on 21 November 2016. Retrieved 21 November 2016.
  59. "Otokar Unveiled Altay-AHT, Urban Operations Tank". 19 May 2017.
  60. "Turkish company Otokar reveals 'urban operation tank'". 19 May 2017.
  61. "Saudi Arabia could be interested to buy the future Turkish main battle tank Altay UAV Anka 2804132 | April 2013 news defence army military industry UK | Military army defense industry news year 2013". Armyrecognition.com. Archived from the original on 4 May 2013. Retrieved 28 February 2015.
  62. "Azerbaijan shows interest for Turkish main battle tank Altay and 8x8 armoured vehicle ARMA 1705134 | May 2013 news defence army military industry UK | Military army defense industry news year 2013". Armyrecognition.com. 17 May 2013. Archived from the original on 16 October 2013. Retrieved 28 February 2015.
  63. "Turkish Company Otokar could exported its new main battle tank ALTAY in Oman 1212141 | December 2014 global defense security news UK | Defense Security Global news Industry army 2014". Armyrecognition.com. Archived from the original on 20 July 2015. Retrieved 28 February 2015.
  64. New Turkish-made main battle tank Altay has received interest from Pakistan and Gulf countries Archived 4 February 2016 at the Wayback Machine – Armyrecognition.com, 1 February 2016
  65. "Turkish Tank Sees Pakistani, Saudi Interest". 19 June 2016.
  66. Herschelman, Kerry (19 March 2019). "Qatar planning to buy Altay tanks". Jane's 360. Washington, DC. Archived from the original on 19 March 2019. Retrieved 19 March 2019.
  67. "Qatar financed 49% of Turkish tank factory". Middle East Monitor. 2 July 2021. Retrieved 6 July 2021.
  68. "Altay Tankı'nın ihalesiyle Erdoğan niçin ilgileniyor". 25 January 2015. Archived from the original on 2 May 2016. Retrieved 20 April 2016.
  69. "Turkey signs mass production deal with BMC for Altay tanks". Daily Sabah. 9 November 2018. Archived from the original on 14 November 2018. Retrieved 13 November 2018.
  70. "Defense World".



На других языках


[de] Altay (Kampfpanzer)

Der Altay ist ein türkischer Kampfpanzer,[2] der auf dem südkoreanischen Modell K2 Black Panther basiert. Der erste Prototyp wurde im Jahr 2012 der Öffentlichkeit vorgestellt.[3]
- [en] Altay (main battle tank)

[es] MİTÜP Altay

MİTÜP ALTAY (una sigla para Milli Tank Üretim Projesi ALTAY, i.e. Proyecto Nacional de un Carro de Combate Principal de Producción Local ALTAY), es el nombre oficial del proyecto turco de un carro de combate principal de tercera generación.[1] Y el nombre se da en honor al General del ejército de liberación turco Fahrettin Altay (1880–1974)[2] que comandó el V Cuerpo de Caballería en la etapa final de la Guerra de Independencia turca.[3]

[ru] Altay

Altay (Алтай) — перспективный турецкий основной боевой танк (ОБТ). Первый образец танка был представлен 11 мая 2011 года. «Алтай» должен заменить используемые ныне турецкой армией немецкие Леопард 1, Леопард 2 и американские M48 и M60.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии